C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
At
/ 84
Main Head Bridges.
Sub. Head Major No.10
Work: Three 40′ G. Deck with Pier Abutments
C.R.E. No.14681.
Quantity DESCRIPTION Rate Unit $ Cts. 7300 Excavation in founds. 10/ The Item Pumping and timbering. 14000 Concrete in founds. 35/- 4900 00 4200 Masonry in Postings. 40/- 1680 00 53000 300 Coping. 40/- 107 Dry Stone Pitching. 2/- 0.ft. 600 00 3 Spans Girders landed at Kowloon 1750/- each 5250 00 carriage to site erection and painting. 1500 00 8 8 8 8 8 8 8 8 8 Total 37473 00 Contingencies 10% 3747 30 Grand Total $41220 30.yewlief notne noolwo
KOITO32 H2ITISIE
3TAMIT2]
J'a
ZOITTIADKAC
C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
At
/ 84
cipues.
bost nisl.
bral .du?
Main Head Bridges.fi/td\iff!//
Sub. Head Majer No.10......
Work Three 40′ G.Deok with Pier Abutments
C.R.E. No.14681.
AMOUNT.
Quantity.
DESCRIPTION.
Rate. Unit.
$
! Cts.
7300
Excavation in founds.
10/. The
Item Pumping and timbering.
14000 Comorete in founds.
1000
27300
00.
35/-
4900
Mind
!
4200 Masonry in Postings.
40/-
1680
53000
+
簿
300
107
3
3
"
.
Superstructure.
40/-
# Coping.
Dry Stone Pitching.
Spans Girders landed at Kowloon
2/- 0.ft.
600
10/-
1070
1750/- each 5250
carriage to site erection and
painting.
and).
500/-
#
1500 100.
00.
8 8 8 8 8 8 8 8 8
37473
IstoT
201 2ɔtɔnigniinoƆ
InfoT braIÜ
Total
Contingincies 10%
Grand Total
3747 30
✓ $41:20 30